America’s Choice High School
Client: Sacramento City Unified School District
Location: 10101 Systems Parkway, Sacramento
Category: Education
Unique Features:
- A complete team effort between the Owner, Design Team, Contractor, and DSA.
- Constructed in less than 18 months.
- Designed in 2 phases with a reuse of the plans for the Multi-Purpose Building.
Professional Services:
- Assist in site acquisition
- Programming
- Participated in stake holder meeting
- Construction Documents
- Construction Administration
- DSA Close-out and certification
Description
This ground-up campus encompassing 55,534 square feet on almost 13 acres was constructed as a “Small High School” focused learning environment. The campus was designed to support a maximum of 500 students..