Genesis High School

    Client: Sacramento City Unified School District

    Location: 5735 47th Avenue, Sacramento

    Category: Education


Unique Features:

  • Lease/Leaseback delivery method
  • Constructed in less than 18 months
  • Used stick framed classroom buildings with a DSA PC

Professional Services:

  • Participated in stake holder meetings
  • Site Design
  • Administration Building Design
  • Construction Documents
  • Construction Administration
  • DSA Close-out and certification

Description
This ground-up campus was one of several small high schools built for SCUSD.  Each classroom building contains a “pod” where students will spend their four years with the same teachers. Each wing has five classrooms; two of those classrooms are a computer lab and a life science classroom. The Administration building contains the Multi-Use Room, locker rooms and kitchen.